Widener University (WU) built a new, $21 million, 200-bed residence hall to address growing housing needs on campus due to increases in undergraduate enrollment and student retention.

Challenge

A fast-track solution needed to complete construction before the start of the fall semester.

General Contractor

IMC Construction, Malvern, PA

Architect

Kimmel Borgrette Architecture, Conshohocken, PA

Installer

A-Deck, Inc., Norristown, PA

Space

New, four story, 50,000 sq. ft. precast plank residence hall

Situation

WU was building a new, $21 million, 200-bed residence hall to address growing housing needs on campus due to increases in undergraduate enrollment and student retention. A fast-track solution needed to complete construction before the start of the fall semester.

Solution

A-Deck, and ARDEX advised the University and project GC, IMC, that installing ARDEX V 1200™ with the CUBE® Medium Capacity Mixing Pump would provide a high quality, fast and reliable solution. ARDEX V 1200’s™ range of application is from 1/4 – 1 1/4”. The CUBE® can pump up to 24,000 pounds per hour, 150 feet vertically and 400 feet horizontally.